top of page

WE MANAGE YOUR SHIPMENT PROCESS...

AHŞAP SANDIK

Project Hizmeti

We have been managing the shipping processes of our companies for more than 10 years. We do the whole packaging process in your factory with our expert personnel.

REFERANSLARIMIZ

logo-schneider-electric-1-1.png
1200px-ABB_logo.svg.png
Ford_logo_flat.svg.png
indir.png
indir (2).png
doktas-logo.jpg
Hyundai_Motor_Company_logo.svg.png
1280px-Perfetti_Van_Melle_logo.svg.png
indir (1).png

PROJECT MODELİ 1 DEFAULT

PROJECT

01

Width*length*height information of the product to be shipped is requested.

02

The dispatch vehicle is clarified.

03

The design of the chest is completed.

04

The production of the approved design is completed.

MONDAY

01

The crate is shipped to the area to be assembled, accompanied by the assembly personnel.

02

The product is placed in the crate under the supervision of expert personnel and fixed.

03

After the dehumidifier is placed, aluminum foil is applied to the product by vacuuming technique.

04

The crate walls are closed and made ready for loading.

05

Under the supervision of our expert personnel, the crate is loaded onto the delivery vehicle with the help of a crane or forklift.

KONTRAPLAK SANDIK

PROJECT MODELİ 2 PER

STAFF EMPLOYMENT

01

A sufficient number of personnel are employed to stay in your factory regularly. All expenses of the personnel are covered by us.

02

All projecting and dispatching processes are carried out by this person. All projecting and dispatching processes are carried out by this person.

03

All of your shipments are inspected and insured by expert inspection teams.

04

All shipping spare material is provided by us.

PROJECT DIRME

01

Dispatch information is transmitted to the main factory by 3k dispatch personnel.

02

The dispatch vehicle is clarified.

03

The design of the chest is completed.

04

The production of the approved design is completed.

MONDAY

01

The crate is sent to the dispatch area. The entire process is managed by us.

02

Our staff in the field receives the crate. It starts the packaging process.

03

After the dehumidifier is placed, aluminum foil is applied to the product by vacuuming technique.

04

The crate walls are closed and made ready for loading.

05

Under the supervision of our expert personnel, the crate is loaded onto the delivery vehicle with the help of a crane or forklift.

ADVANTAGES

'PROJECT MODEL 2 PRO' was developed to alleviate the shipment planning burden on companies. Companies that meet 'PRO' get rid of both the burden of personnel and the disruptions that occur in shipments. In this model, the entire process is carried out by our expert personnel. We actively undertake the entire project design process from intermediate shipments to the destination port. In this way, the company can only focus on the product it will produce. We have been implementing this system in the world energy giants GENERAL ELEKTIRIK-SCHNEIDER and ALSTOM for many years and the process works very efficiently on behalf of our companies.

PROJECT MODELİ 3 DEPOFIX

PROJECT PRO PHASE

01

All project pro stages are implemented.

02

Crate items are prepared to be picked up from your site.

03

It is loaded on our shipping vehicles.

04

It is withdrawn to our warehouse.

PROJECT PRO PHASE

01

Sahanızda ambalajladığımız ürünler güvenlikli depolarımıza sevkini sağlar.

02

We insure all of the products shipped to our warehouses under 3k assurance.

03

It is stored under control in our closed and open areas in our warehouses until the dispatch date comes.

04

Loading and port delivery of the boxes with the shipping date are provided.

DEPOLAMA

ALL YOUR SHIPMENT PROCESS IS IN SAFE HANDS..

2143.jpg
full-length-carpenter-walking-through-workshop-wearing-face-mask-due-coronavirus-pandemic.
SANDIK
SANDIK
SANDIK
SEVKİYAT
wooden-boxes-warehouse-boxes-out-wood-packing-industrial-machinery.jpg
SANDIK
sandık çalışması.jpg

ÜÇ KARDEŞLER AHŞAP AMBALAJ

FATİH MAHALLESİ ÇENEDERE CADDESİ NO:145

DERİNCE/ KOCAELİ - TURKİYE

TEL: (0262) 223 28 75

info@3kambalaj.com  

Contact us

THANKS...

happy-carpenter-with-protective-face-mask-standing-workshop-looking-camera.jpg
bottom of page